Skip to main content
EZPCBA

Mid-volume PCBA

Mid-volume PCB assembly with a locked process

Once the design is frozen, the job changes from problem-solving to repeatability. Mid-volume releases run on a fixed process document, a fixed approved-parts list and a release schedule you set.

Service window

Service window
ParameterScope
Annual volume1,000–50,000 pcs; above that on review
Release modelScheduled call-offs against one approved BOM and process document
Process controlLocked solder profile, stencil design and placement program per revision
TestAOI plus ICT or FCT; test coverage agreed before the first release
ToolingStencils, fixtures and test jigs amortized across the release plan
Cost reviewLine-level cost-down proposals on packaging, alternates and panel utilization
DocumentsFAI, process document, test reports, RoHS and REACH declarations per lot

How a release plan works

  • 1 · Freeze

    Board revision, approved parts list and test coverage are fixed in one document both sides sign off.

  • 2 · Qualify

    A first production lot proves the process at volume before the remaining releases are scheduled.

  • 3 · Release

    Call-offs are pulled against the frozen kit, so parts are bought ahead of the schedule rather than per order.

  • 4 · Review

    Yield, defect Pareto and cost drivers are reported per lot, feeding the next release.

Where it fits

  • Industrial equipment

    Steady annual demand where documentation and traceability matter more than the last cent.

  • Consumer ramp-up

    Products moving from pilot to volume that need cost-down without changing suppliers.

  • Multi-variant families

    One base board with option builds, released on separate schedules from one approved BOM.

Mid-volume FAQ

Do you hold safety stock for us?
Yes, against an agreed release plan. Long-lead parts are bought ahead so a call-off is not waiting on a distributor lead time.
How are engineering changes handled?
A change opens a new revision with its own approved parts list and first-article check; old and new revisions are never mixed in a lot.
Which factory builds my order?
One nominated partner factory owns a mid-volume program for the life of the release plan, so process knowledge is not rebuilt every lot.
Can you support an audit?
Yes. Process documents, test records and traceability data can be presented, and factory audits can be arranged with notice.

Plan a production release

Share your annual quantity and release pattern; we quote unit price, tooling and the schedule in USD.